2020+ BMW G82 M4 / 4 Series G22 Dry Carbon Fiber Doors (Pair)
2020+ BMW G82 M4 / 4 Series G22 Dry Carbon Fiber Doors (Pair)
Couldn't load pickup availability
2020+ BMW G82 M4 / 4 Series G22 – Dry Carbon Fiber Doors (Pair)
Upgrade your BMW G82 M4 or G22 4-Series with these Dry Carbon Fiber Doors, built for weight reduction, performance, and ultimate track-ready aesthetics. Each door is hand-crafted from autoclaved dry carbon fiber for superior rigidity, precision fitment, and an ultra-lightweight finish.
🔥 Product Details
• Fitment: 2020 + BMW M4 (G82) / 4-Series (G22)
• Material: 100 % Dry Carbon Fiber (autoclaved) — highest strength-to-weight ratio
• Finish: Matte Dry Carbon (optional gloss coating by request)
• Configuration: Sold as a pair (driver + passenger)
• Weight: Significantly lighter than OEM steel or aluminum doors
• Installation: Direct replacement; professional installation required
• Note: If you wish to purchase a single door, please contact us by email or send a message via Instagram @lpperformanceco.
⚙️ Features & Benefits
✅ Drastically reduces vehicle weight for improved performance
✅ OEM-level precision and alignment
✅ UV-resistant matte finish prevents fading or yellowing
✅ Motorsport-inspired design with factory mounting compatibility
✅ Perfect for track builds or high-end show cars
💎 Why Choose LP Performance Co.
• Real dry carbon fiber — no fiberglass or hydro-dip imitation
• OEM-level fitment guaranteed
• Worldwide shipping available
• Trusted by professional builders and performance enthusiasts globally
⚠️ Disclaimer
Professional installation is strongly recommended to ensure proper fitment and alignment.
Minor adjustments may be required due to OEM manufacturing tolerances.
LP Performance Co. is not responsible for any damage caused during or after installation, or from misuse or improper handling.
All custom-built and carbon-fiber products are non-refundable and non-returnable once the item has been installed.
Please note: Matte Carbon and Forged Carbon finishes (if requested) are made-to-order and require approximately 6–8 weeks for production.
Share
